With your permission, a trained engineering technician will visit your facility and perform a high-level inventory of your building’s equipment and characteristics. During the site visit, the technician will ask general operational questions and then walk through the site to collect data.

The technician will collect site-specific information about equipment, lighting, occupancy, run-times, building construction, mechanical systems, and other details impacting overall energy use. Any information you may be able to provide in advance, such as building plans, equipment specifications, or schedules, may expedite the on-site effort. 